Skip to main content
Loading…
This section is included in your selections.

Annually, each Company shall provide the Director with data in a digital or other format specified by the Director which details and documents all the geographic locations of Facilities located in PROW. The record shall be updated whenever there have been significant changes in the location of the Facilities. In addition, the Company shall maintain in its local office a complete, fully-dimensioned, and up-to-date set of as-built system maps and drawings upon completion of construction. As-built drawings shall show all Facilities and reflect whether the Facilities, including but not limited to cable facilities are presently being used. Dark fiber shall be denoted as such. The scale of maps and drawings shall be sufficient to show the required details in easily readable form and size. (Ord. 7726-NS § 1 (part), 2020: Ord. 7083-NS § 4 (part), 2009)