Skip to main content
Loading…
This section is included in your selections.

Application for lot line adjustment shall be made to the City Engineer. In addition to the application the following may be required by either the City Engineer or the Planning Director:

A. If circumstances warrant, a soils report, title report, and initial study as described in Section 21.16.030.

B. A vicinity map, site development plan and an applicant’s statement as described in Section 21.16.030. (Ord. 5793-NS § 2 (part), 1987)