Skip to main content
Loading…
This section is included in your selections.

Chapter 6 of the 2022 California Residential Code is adopted in its entirety subject to the modifications thereto which are set forth below.

Table R602.10.3(3) BRACING REQUIREMENTS BASED ON SEISMIC DESIGN CATEGORYi, j

Add new footnotes "i" and "j" to the end of Table R602.10.3(3) to read:

i.    Methods GB, PBS, HPS and SFB are not permitted in Seismic Design Categories D0, D1, and D2.

j.    Method DWB are not permitted in Seismic Design Categories D0, D1, and D2 where S1 is greater than or equal to 0.75.

Add a new Subsection R602.10.4.4.5, to read:

R602.10.4.4.5 Limits on methods GB and PCP. In Seismic Design Categories D0, D1, and D2, Method GB is not permitted, but gypsum board is permitted to be placed on the opposite side of the studs from other types of braced wall panel sheathing. In Seismic Design Categories D0, D1, and D2, the use of Method PCP is limited to one-story dwellings and accessory structures.

(Ord. 7839-NS § 2, 2022)