Skip to main content
Loading…
This section is included in your selections.

Field inspections will be made by the City to assure that the permittee is maintaining a right-of-way for the public, both in the sidewalk and in the street areas.

The inspection charge shall be paid at the time the permit is issued and shall be based on the City’s estimate of the time required for inspection service and the permittee’s estimate of time for completion of all work, including cleanup and clearing the public right-of-way. If the work is unfinished at the expiration of the time estimated by the permittee, the permittee shall then deposit additional inspection fees based on the revised estimate of time for completion of work. Such charge, if not paid, shall be deducted from the surety company on its bond, if a surety bond has been filed in lieu of the required deposit.

A permit fee in the amount as set forth in the public works master fee schedule, as adopted by resolution of the City Council, shall be charged for any overheight, overweight or overwidth vehicle or any overheight, overweight or overwidth load being operated on any public street. An hourly charge for inspection services (one hour minimum) shall be made for inspection of any overheight, overweight or overwidth vehicle with an overheight, overweight or overwidth load being operated on any public street; such fee shall be doubled for inspections on Saturday, Sundays, and holidays. (Ord. 5936-NS § 1, 1989: Ord. 5478-NS § 1 (part), 1982: Ord. 5355-NS § 1 (part), 1981: Ord. 5275-NS § 1 (part), 1980: Ord. 5177-NS § 1 (part), 1979: Ord. 5073-NS § 1 (part), 1978: Ord. 4362-NS § 1 (part), 1968: Ord. 4111-NS § 8, 1965)